Larger Upcoming Jobs

Since our purchase of Bandit, we've been making a list of some larger jobs that we eventually want doing. We're planning on just getting them over and done with before the end of the year so we need to start thinking and planning some things through. We would have done these things sooner but we've had larger priorities and investments that needed doing to the boat over the last year and a half.

The list includes:

  1. Have a new canopy made and fitted
  2. Replacement of all the engine instrument gauges at the helm (with Faria gauges)
  3. Have the cabin reupholstered + pelmets and curtains
  4. Have the midships cabin reupholstered
  5. Replace all the headlining in the midships cabin
  6. Replace the old carpet in the cabin and midships cabin
  7. Refit the galley with new worktop, appliances etc
  8. Have Tek-Dek synthetic teak made up for the two steps leading to the cabin
  9. Have Tek-Dek synthetic teak laid down at the helm

Comments

Popular Posts

Refurbishing Our Old Style Eltrim Trim Tab Controller

New Instrument Gauges - Installing